MonoSign using docker-swarm on high availability infrastructure. In the below table described how many servers must be deployed for high availability in datacenter infrastructure.

Single Data Center with/without DMZ

Server Count(Min)

DataCenter Site

Operational Site

Information

1

Active DataCenter

Production or DMZ

Account Application Installation

2

Active DataCenter

Production

All MonoSign Services

Multiple Data Center with/without DMZ

Server Count(Min)

DataCenter Site

Operational Site

Information

1

Active DataCenter

DMZ

Account Application Installation

1

Passive DataCenter or Disaster Recovery-Site

DMZ

Account Application Installation

2

Active DataCenter

Production

All MonoFor Services Installation

2

Passive DataCenter or Disaster Recovery-Site

Production

All MonoFor Services Installation

MonoSign Account application supporting 60K login requests per/sec with minimum server specs highlighted in this page. If you have more than 60K login requests you can increaser server count in the DMZ Site.

If Passwordless Login and MonoSign Authenticator App will be used DMZ installation must be done. Otherwise Passwordless Login and MonoSign Authenticator App Push Services will not be work properly.

If redundancy is also required for each DataCenter minimum server count must be is two(2).