Everything a partner needs to run a Monopam proof of concept after the PoC installation: first configuration, gateway installation, the scenario catalogue with success criteria, a 30 to 45 minute demo flow, and troubleshooting.
|
Page |
Use it for |
|---|---|
|
First configuration after installation |
From an empty tenant to the first recorded session. |
|
Install a PoC gateway |
Windows or container gateway, recording folders and network ports. |
|
PoC scenarios and success criteria |
What to prove, how to prove it and what counts as success. |
|
Demo flow |
The order to show the product in, with screenshots. |
|
PoC troubleshooting |
The problems PoCs hit most and how to fix them. |
Before you start, complete PoC Requirements, PoC Requirements - Check and PoC Installation in the Latest section. Detailed product documentation is in the Monopam User Guide.